{ "culture": "en-US", "name": "", "guid": "", "catalogPath": "", "snippet": "Trails throughout the City of Columbus, GA.", "description": "

The Riverwalk has been realigned using survey grade points provided from the Engineering- Survey Division in 2019. The IT Department GIS staff realigned the Fall Line Trace (Dragonfly section) and MLK trail using survey grade equipment in February 2020. The remainder of the Fall Line Trace was digitized using a combination of the 2013 and Google Imagery in January 2020. The Follow Me Trail section has been digitized using 2017 Google Imagery and the bridge over Victory Drive was located using survey grade point data from the Engineering -Survey Division. <\/SPAN><\/P>

The section of the Fall Line Trace adjacent to Buck Ice on Talbatton Road has also been adjusted, post construction (not as-built data). (RBL 01/13/2020).<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>", "summary": "Trails throughout the City of Columbus, GA.", "title": "Vector.DBO.Trails", "tags": [ "Trails", "Paths", "Transportation", "Hiking", "Biking", "Mountain Biking", "Friends of the DragonFly", "Standing Boy Trails", "CCG", "Columbus", "GA", "Columbus Consolidated Government" ], "type": "", "typeKeywords": [], "thumbnail": "", "url": "", "minScale": 150000000, "maxScale": 5000, "spatialReference": "", "accessInformation": "Columbus Consolidated Government GIS, IT Department, Kaizen Collaborative, Trail Solutions\n\nColumbus Consolidated Government - Information Technology\n1111 1st Ave Columbus, GA 31901 \n(706) 653-4045", "licenseInfo": "

GIS data is made available by the Columbus Consolidated Government as a public resource. Maps and data are to be used for reference purposes only. The data contained is subject to constant change. Map information is believed to be correct but is not guaranteed or warranted for any specific purpose by the Columbus Consolidated Government or any of its associated departments or agencies.<\/SPAN><\/P><\/DIV><\/DIV><\/DIV>" }